Road Trials

For the past 20 years Kemps have been the preferred roadstud installation/removal contractor on the annual road trial sites. Road trials take place to allow manufacturers to gain type approval for new roadstud products. After installation trial studs are left for 12 months under normal traffic conditions. They are then removed by Kemps and tested by BSI before…

Full Case Study

A17 Lincolnshire surface dressing night works (Lincolnshire CC/Kier)

Removal and installation of inset roadstuds The main contractor’s objective was to complete over 104,000m² of surface dressing in 10 nights including removal and installation of roadstuds before and after surface treatment. Kemps once again rose to the challenge by removing 2124 Catseyes in just 3 nights before surface dressing took place and installing 2202 Armourstuds in…

Full Case Study

Cambridgeshire Guided Busway (Atkins)

Installation of Astucia Solarlite Flush Studs Cambridgeshire Guided Busway is the largest of its kind in the world. Kemps were selected by main contractor Atkins to install Astucia Solarlite Flush Studs on the footpaths and cycle tracks running alongside the Busway. Due to restricted access the cavities had to be drilled using a diamond core drill…

Full Case Study