Road Trials

For the past 20 years Kemps have been the preferred roadstud installation/removal contractor on the annual road trial sites. Road trials take place to allow manufacturers to gain type approval for new roadstud products. After installation trial studs are left for 12 months under normal traffic conditions. They are then removed by Kemps and tested by BSI before type approval is granted.